Skip to content

Show dyb_web plan progress in the status line - #344

Merged
tylercschneider merged 10 commits into
mainfrom
feature/status-line-work-item-plan
Nov 4, 2026
Merged

tylercschneider merged 10 commits into
mainfrom
feature/status-line-work-item-plan

Conversation

@tylercschneider

Copy link
Copy Markdown
Collaborator

One Sentence Summary

The owner sees the plan progress of the current work item on the status line, in a repo that keeps its work in dyb_web, without looking it up in production.

ACs Covered

  • On a work item's branch in a dyb_web repo, the status line shows the plan's title, the work item's stage and each stage's progress.
  • On that branch the status line never shows a GitHub issue's plan.
  • Ticking a criterion in a dyb_web repo changes nothing and says why.
  • A repo with no work-store setting shows GitHub plan progress exactly as before.

Decision Log

Which repos does ticking a criterion refuse when the current repo keeps its work in dyb_web?

Only the repo the setting names, rather than every repo ticked from that folder, since an issue in another repo still has boxes to tick.

Code Example

Not relevant.

Out of Scope

  • A criteria bar for dyb_web work items is not built, since they have no acceptance criteria to tick.

Ticket Billed Against

Not specified.

Tokens Used

Not measured.

Effort

Not measured.

Time Spent

Not measured.

Closes #328


Generation Metadata

Scribe: pr-scribe 9d1ee89
Rules: pr-body 9d1ee89, draft-reading 0d470c5, writing-style c3c2f61
Model: claude-sonnet-5-5, cc 2.1.314

tylercschneider and others added 10 commits November 4, 2026 13:39
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
…tatus line

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
…s branch

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
…branch

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@tylercschneider
tylercschneider merged commit 7154db6 into main Nov 4, 2026
1 of 2 checks passed
@tylercschneider
tylercschneider deleted the feature/status-line-work-item-plan branch November 4, 2026 19:10
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Show dyb_web plan progress in the status line

1 participant