Skip to content

build(toolchain): pin Rust 1.99.1 - #1222

Merged
d-o-hub merged 3 commits into
mainfrom
chore/pin-rust-1.99.1
Oct 30, 2026
Merged

d-o-hub merged 3 commits into
mainfrom
chore/pin-rust-1.99.1

Conversation

@d-o-hub

@d-o-hub d-o-hub commented Oct 29, 2026

Copy link
Copy Markdown
Owner

Scope

Pin the shared build toolchain to Rust 1.99.1 in rust-toolchain.toml and the centralized CI setup action. Keep the fuzz job on its intentionally dated nightly override, updating its comment to reflect the stable pin. Update the rust-overlay flake lock so Nix resolves the exact toolchain.

Verification

  • rustup toolchain install 1.99.1 completed; rustc --version reported 1.99.1.
  • nix develop --no-write-lock-file --command rustc --version resolved via the updated flake and reported rustc 1.99.1.
  • yamllint -c .yamllint.yml .github/actions/setup-rust/action.yml .github/workflows/fuzz.yml and actionlint .github/workflows/fuzz.yml passed.
  • do-harness verify --set verification --strict --record: all 13 sensors passed.
  • do-harness status --set verification: green; evidence current.
  • ./scripts/quality-gates.sh passed.

Generated build artifacts were cleaned after verification.

@codacy-production

Copy link
Copy Markdown
Contributor

Up to standards ✅

🟢 Issues 0 issues

Results:
0 new issues

View in Codacy

NEW Get contextual insights on your PRs based on Codacy's metrics, along with PR and Jira context, without leaving GitHub. Enable AI reviewer
TIP This summary will be updated as you push new changes.

@codecov

codecov Bot commented Oct 29, 2026

Copy link
Copy Markdown

Codecov Report

✅ All modified and coverable lines are covered by tests.

📢 Thoughts on this report? Let us know!

@d-o-hub
d-o-hub enabled auto-merge (squash) October 29, 2026 14:12
@github-actions github-actions Bot added the release-preparation Trusted-collaborator release preparation PR label Oct 29, 2026
@d-o-hub
d-o-hub force-pushed the chore/pin-rust-1.99.1 branch from 26d1ae3 to b28665a Compare October 30, 2026 10:32
@d-o-hub d-o-hub removed the release-preparation Trusted-collaborator release preparation PR label Oct 30, 2026
@github-actions github-actions Bot added the release-preparation Trusted-collaborator release preparation PR label Oct 30, 2026
@sonarqubecloud

Copy link
Copy Markdown

@d-o-hub
d-o-hub merged commit 16a3139 into main Oct 30, 2026
33 checks passed
@d-o-hub
d-o-hub deleted the chore/pin-rust-1.99.1 branch October 30, 2026 14:06
d-o-hub added a commit that referenced this pull request Oct 30, 2026
Adds the measured 2026-10-30 verification table and closes ACT-403/407/410

with the nightly runs, #1203 and #1222 (16a3139).
d-o-hub added a commit that referenced this pull request Oct 31, 2026
…1231)

Adds the measured 2026-10-30 verification table and closes ACT-403/407/410

with the nightly runs, #1203 and #1222 (16a3139).
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

release-preparation Trusted-collaborator release preparation PR

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant