Start cedit and add a sprinkler. The default position is outside the compartment. I think best would be to not populate default values but if we do that the default position be the center of the ceiling.
If we do use defaults maybe an RTI of 130 which we can at least reference to NUREG-1805 as a generic standard response RTI. 73.9 C is 165 F which is OK. The default flow of 7E-5 m/s is (if I did the math right) 0.1 gpm/ft^2 which would be a light hazard rate. Would an ordinary hazard rate (twice the flow or 1.4E-4 m/s) be a better default?
Start cedit and add a sprinkler. The default position is outside the compartment. I think best would be to not populate default values but if we do that the default position be the center of the ceiling.
If we do use defaults maybe an RTI of 130 which we can at least reference to NUREG-1805 as a generic standard response RTI. 73.9 C is 165 F which is OK. The default flow of 7E-5 m/s is (if I did the math right) 0.1 gpm/ft^2 which would be a light hazard rate. Would an ordinary hazard rate (twice the flow or 1.4E-4 m/s) be a better default?