buildcast

Probabilistic build forecasting from git history — calibrated, self-validating, and honest about its own accuracy.

Point it at a repo, say how many tasks remain, and buildcast forecasts the remaining work from your actual commit velocity as a calibrated P50 / P85 / P95 range — then proves the calibration on your own history. It treats "how long will this take?" as a probabilistic forecasting problem and scores itself with proper scoring rules, not vibes.

$ buildcast --repo . --remaining 6 --wip 1 --wip-elapsed 600

  buildcast · 7 tasks left · 58 history samples

  EFFORT (hands-on build time)
    P50  ~3.3h   coin-flip
    P85  ~6.0h   safe commitment
    P95  ~7.2h   high confidence

  CALENDAR (duty cycle 35% — active vs idle)
    P50  Tue, Jun 30, 2:21 AM
    P85  Tue, Jun 30, 10:01 AM

  model: empirical · half-life none (stationary) · n_eff 58
  auto-calibrated by walk-forward CRPS

Zero dependencies · deterministic (seeded) · 114 tests · Node ≥ 18.


Why this is not another estimate-multiplier

Most "estimators" multiply a guessed velocity by a task count. buildcast is built on three ideas from the forecasting literature that those tools skip:

  1. Forecast the distribution, not a point. A single number is a lie with a confidence interval hidden inside it. buildcast Monte-Carlos the sum of the remaining tasks and reports percentiles. Summing N tasks cancels per-task variance (central-limit), so the band is far tighter than single-task-range × N.
  2. Score it with a proper scoring rule. It evaluates itself with the Continuous Ranked Probability Score (CRPS) under walk-forward (rolling-origin) cross-validation — the same machinery used to verify weather ensembles — so "accuracy" is measured, not asserted.
  3. Adapt to your data, and never do worse than the naive baseline. It auto-selects its recency half-life, its sampler, and a reference-class bias correction by scoring each candidate on your repo's own history. The plain bootstrap is inside its model space, so it provably degrades to the baseline when nothing fancier helps — and only deploys heavier machinery when your data rewards it.

Benchmarks

Every number below is reproducible: --validate runs the naive bootstrap and the full engine head-to-head over identical walk-forward origins on a repo's own history and reports the CRPS skill score 1 − CRPS_v2/CRPS_v1 (higher = better), point error (MAPE of P50), and coverage. The synthetic cases below are generated from a fixed seed so you can reproduce them exactly (benchmarks/synthetic.js).

history (70 tasks, seeded) CRPS skill P50 error (MAPE) P95 coverage what's happening
drifting (velocity slows ~10×) +78% 52% → 12% 3% → 100% the regime a stationary bootstrap silently breaks on
heavy-tailed (σ=1.25 lognormal) +8% 117% → 86% 100% → 94% a fitted tail beats the empirical max
stationary (well-behaved) ~0% — ~ideal nothing to fix; it ties the baseline by design

On real, near-stationary repositories the full-distribution score (CRPS) ties the baseline — because a plain bootstrap is already near-optimal there — while the P50 point estimate you actually read tightens by ~20% (reference-class uplift). The headline is the drifting column: that 0% → 50% P50 coverage and 3% → 100% P95 coverage is a forecaster going from systematically wrong to calibrated.

The honest takeaway, stated plainly: buildcast is never worse than the naive bootstrap, and it is dramatically better exactly when the naive bootstrap fails (drift, fat tails). On already-easy histories it correctly does nothing clever.

Reproducing the benchmarks

node benchmarks/synthetic.js     # prints the table above from a fixed seed
buildcast --repo /your/repo --validate   # A/B on your own history

How it works

git log ─▶ clean recency-weighted samples ─▶ fit + auto-select model ─▶ Monte-Carlo
          (winsorize away-gaps,             (lognormal/gamma/weibull       sum of N
           exp. half-life weights)           by AICc, or spliced tail,      (+ conditional
                                             or plain bootstrap)             in-flight task)
                                                      │
                                          walk-forward CRPS picks the
                                          half-life, sampler & uplift

The statistical machinery, each piece earning its place against the backtest:

  • Recency weighting. Samples are exponentially down-weighted by age (a learned half-life), with the Kish effective sample size n_eff = (Σw)²/Σw² guarding against over-aggressive discounting. This is what tracks non-stationary velocity drift.
  • Distribution fitting. Log-normal, gamma (Minka's fixed-point MLE), and Weibull are fit by weighted maximum likelihood and selected by corrected AIC (AICc) — with a reliability-weight Bessel correction on the variance so the tail isn't optimistically thin.
  • Spliced tail. For burst-y builds the body is empirical but the upper tail is a fitted log-normal spliced in above the 80th percentile, so P95/P99 can extrapolate beyond the largest observed task.
  • Reference-class uplift. A multiplicative bias correction (Flyvbjerg's outside view) calibrated from the walk-forward residuals and applied only if it lowers held-out CRPS.
  • Hierarchical shrinkage. Per-task-type means are shrunk toward the global mean by empirical Bayes (DerSimonian–Laird between-type variance τ²), so a test-typed forecast borrows strength when its own history is thin.
  • Conditional in-flight task. A task already running for t seconds is drawn from the truncated conditional P(D | D > t), not a fresh task — a real survival-analysis remainder, not draw − t.
  • Self-validation. CRPS (closed O(m log m) ensemble form), PIT histograms, coverage, and pinball loss under expanding-window walk-forward, with a paired bootstrap on the A/B skill score.

Full derivations, formulas, and citations: docs/METHODOLOGY.md.


Honesty: how accurate is it, really?

A forecast claiming 100% accuracy is lying — the future is genuinely uncertain. buildcast tells you how often it's right, by construction, and lets you audit that on your own repo:

$ buildcast --repo . --backtest

  buildcast backtest · 24 hold-out windows · horizon 5 · sampler empirical
  P50 coverage   52%   (ideal 50%)
  P85 coverage   83%   (ideal 85%)
  P95 coverage   96%   (ideal 95%)
  P50 error      19%   mean abs % off
  mean CRPS      311s

--backtest hides the last K tasks, forecasts them from the rest, and checks how often reality landed inside each band — across every hold-out window. Accuracy depends on your data, not just the math, and the tool shows you which regime you're in instead of hiding it.

It forecasts effort (active build-time) far more reliably than a calendar date — it cannot know when you'll next sit down. The duty-cycle calendar is a best-effort projection layered on top, not a validated promise.


Install & usage

# run without installing (once published / from the repo)
npx buildcast --repo . --remaining 5
# or clone and run — zero dependencies
git clone https://github.com/ish-cs/buildcast && node buildcast/bin/buildcast.js --repo . --remaining 5
buildcast --repo <path> --remaining <N> [options]

  --repo <path>        git repo to read              (default: .)
  --match <regex>      task-closing commit filter     (default: ^(feat|fix|perf|refactor)\()
  --remaining <N>      untouched tasks left           (required unless --backtest/--validate)
  --wip <N>            in-flight tasks                (default 0)
  --wip-elapsed <sec>  how long the WIP task has run  (default 0)
  --types a,b,c        known types of remaining tasks, in order
  --horizon <N>        hold-out window for --backtest/--validate (default 5)
  --no-auto            skip auto-calibration (plain bootstrap)
  --json               machine-readable output
  --backtest           report calibration accuracy on this repo's own history
  --validate           A/B the naive bootstrap vs the full engine on your history

A "task" is one task-closing commit (feat(...), fix(...), …). Amend gaps < 30s are dropped; an "away" gap longer than a learned threshold is winsorized (kept but capped), so an overnight pause neither poisons the velocity nor vanishes from the count.


Architecture

Seven small, single-purpose, independently-tested modules — pure JavaScript, no runtime dependencies, fully deterministic from a seed:

module responsibility
mathutil erf/Φ/Φ⁻¹, lnΓ/ψ/ψ′, seeded RNG — verified against known values
samples commits → recency-weighted effort samples, winsorize, Kish n_eff
dist weighted-MLE fits, AICc selection, sampling models, EB shrinkage
scoring CRPS (O(m log m)), PIT, coverage, pinball
forecast Monte-Carlo sum, conditional WIP, auto-calibration
backtest walk-forward, v1↔v2 A/B, skill score, paired bootstrap
git minimal commit + churn reader (numstat)

Every estimator is pinned by a parameter-recovery test (fit a known distribution → recover its parameters); the CRPS implementation is checked against the O(m²) brute-force form. npm test → 114/114.


Limitations

  • Forecasts active work, not calendar time — the duty-cycle date is a best-effort projection.
  • It models velocity drift, but cannot foresee a discontinuity with no precedent in the history (a brand-new kind of task, an unstarted scope change). Run --validate to see how much the modelling is (or isn't) helping.
  • It forecasts the count you give it; it doesn't know how many tasks truly remain. Wrong --remaining → wrong answer.
  • Needs ≥ 5 task samples to forecast, ~20 for a meaningful --backtest/--validate.
  • Per-commit churn is read but not used in the blind forecast: integrating out an unknown future task's size returns the unconditional distribution, so churn only helps when a task's size is known. The capability is wired and tested for that case.

References

The methods buildcast leans on, for the curious:

  • T. Gneiting & A. Raftery (2007), Strictly Proper Scoring Rules, Prediction, and Estimation — CRPS.
  • B. Flyvbjerg (2006), From Nobel Prize to Project Management — reference-class forecasting / the outside view.
  • T. Minka (2002), Estimating a Gamma Distribution — the gamma MLE fixed-point.
  • H. Akaike (1974) & Hurvich–Tsai (1989) — AIC and the small-sample correction AICc.
  • R. DerSimonian & N. Laird (1986), Meta-analysis in Clinical Trials — the between-group variance estimator used for shrinkage.
  • L. Kish (1965), Survey Sampling — effective sample size under weighting.
  • Fenton (1960) / Wilkinson — the log-normal-sum moment-matching cross-check.
  • Hyndman & Athanasopoulos, Forecasting: Principles and Practice — rolling-origin evaluation.

See docs/METHODOLOGY.md for how each is used, with formulas.


License

MIT.

About

Probabilistic build forecasting from git history — recency-weighted Monte Carlo, auto-calibrated and self-validated by walk-forward CRPS. Zero deps, deterministic.

Resources

Stars

0 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors

Languages