You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Follow-up program for Android capabilities intentionally excluded from the mobile-v1 and Android TV launch boundary in #14. These items remain captured without delaying either launch.
Outcome
The shipped Compose mobile and Android TV apps gain the deferred platform integrations, richer home and sharing surfaces, tablet features, and playback-engine proof that were explicitly placed after v1.
Completion boundary
This epic does not gate #14. It closes when every child below is complete or closed with a recorded product or technical decision. Work remains unscheduled until an item receives an explicit Wave in the Frontend project.
Each child follows the same proof contract as #14: repository verification is green, behavior is exercised on the harness or required physical device, acceptance criteria carry linked evidence, and visible behavior has screenshots or a recording published from the PR with attach put <file> --repo putdotio/putio-android --pr <number> (or gh attach put ...). Link the returned preview URL, use --markdown only for an inline embed, follow the installed attach-cli skill, and do not commit generated proof media.
Important
Follow-up program for Android capabilities intentionally excluded from the mobile-v1 and Android TV launch boundary in #14. These items remain captured without delaying either launch.
Outcome
The shipped Compose mobile and Android TV apps gain the deferred platform integrations, richer home and sharing surfaces, tablet features, and playback-engine proof that were explicitly placed after v1.
Completion boundary
This epic does not gate #14. It closes when every child below is complete or closed with a recorded product or technical decision. Work remains unscheduled until an item receives an explicit Wave in the Frontend project.
Child issues
Definition of done
Each child follows the same proof contract as #14: repository verification is green, behavior is exercised on the harness or required physical device, acceptance criteria carry linked evidence, and visible behavior has screenshots or a recording published from the PR with
attach put <file> --repo putdotio/putio-android --pr <number>(orgh attach put ...). Link the returned preview URL, use--markdownonly for an inline embed, follow the installedattach-cliskill, and do not commit generated proof media.Boundaries