TERMINAL CLOSURE — 2026-10-02
Gate 3's defined headless durability evidence is complete for ordinary protected records. Residual ownership is explicit: Gate 4 owns serialization/admission/journal/rekey and the key-epoch crash window; Gate 5 owns asset-pair commit semantics; Gate 6 owns packaged physical power-loss proof; #948 owns protected deletion before Gate 7; the legacy TS/Tauri authority is replaced only at Gate 7.
HISTORICAL / SUPERSEDED — CURRENT EXECUTION — 2026-10-01 23:12 CEST — 3C PART 2 ACTIVE — superseded by terminal closure 2026-10-02
GATE_3 = ACTIVE
SLICE_3A = TERMINAL via #930
SLICE_3B_PART_1 = TERMINAL via #937
SLICE_3B_PART_2 = TERMINAL via #940
SLICE_3C_PART_1 = TERMINAL via #941 → main 03a24786f1c9fda76656dbbd2a635e324331ec81
CURRENT_MAIN = 03a24786f1c9fda76656dbbd2a635e324331ec81
RESULTING_MAIN_VERIFICATION = TERMINAL
CI / CODEQL / SECURITY / SIGNATURES = SUCCESS
VERCEL_PRODUCTION = READY on exact CURRENT_MAIN
SLICE_3C_PART_2 = PR #942 ACTIVE
PR_942_HEAD = 48525c99ed20c88774df161b8d8c0d474a785302
PR_942_MERGE_READY = NO
SLICE_3C_PART_3 = NEXT — two-phase root/anchor commit + write integration + list_records + retention
THEN = terminal Gate 3 + #357/QNB-10 reconciliation
PRODUCTION_AUTHORITY_SWITCH_ALLOWED = NO
#941 is terminal and production-proven. #942 is now the sole active Gate 3 engineering owner. Current exact-head review/CI is not terminal. Codex returned four P2s on 48525c99...: reversible identity recovery for hashed bindings, non-ordinary-class rejection, shard-bound enforcement in catalog_set_digest, and redacted catalog Debug. CodeRabbit independently confirms the non-ordinary-class issue as Major. CodeAnt adds the same class-admission concern plus decoded binding/template/project-scope validation and a shard-bound API nitpick. CodeScene has argument-count health findings; DeepSource has one minor range-style finding. Node 22/24 and Cubic are still running; Sourcery is quota-limited. Validate the full epoch first and converge in one correction wave where practical.
The Gate 3 closure must still cover the asset-pair marker/catalog boundary identified during #941 before claiming complete committed authority.
HISTORICAL / SUPERSEDED — CURRENT EXECUTION — 2026-10-01 — 3B TERMINAL / 3C PART 1 ACTIVE — superseded 2026-10-01 23:12 CEST
GATE_3 = ACTIVE
SLICE_3A = TERMINAL via #930 → main 01230de4758208f7b682ef9548720b0fd39ce801
SLICE_3B_PART_1 = TERMINAL via #937 → main 90ae5c4c44596b423a502dc4ce2d2213886092ca
SLICE_3B_PART_2 = TERMINAL via #940 → main e43559b9bd6c5a8b6f5ba06ed9a2da42079551e1
CURRENT_MAIN = e43559b9bd6c5a8b6f5ba06ed9a2da42079551e1
RESULTING_MAIN_VERIFICATION = TERMINAL
CI / CODEQL / SECURITY / SIGNATURES = SUCCESS
VERCEL_PRODUCTION = READY on exact CURRENT_MAIN
SLICE_3C_PART_1 = PR #941 ACTIVE
PR_941_HEAD = 7a1edcf1527947e7b75cc8e8c6fbe6e1ea11a701
PR_941_MERGE_READY = NO
SLICE_3C_PART_2 = NEXT — catalog descriptors/pages + shard assignment
SLICE_3C_PART_3 = THEN — two-phase root/anchor commit + write integration + list_records + retention
THEN = Gate 3 closure + #357/QNB-10 reconciliation
PRODUCTION_AUTHORITY_SWITCH_ALLOWED = NO
#940's resulting main is fully green and production-proven; Gate 3B is no longer active work.
#941 is the current Gate 3 owner. Its latest head already incorporates the bootstrap journal_revision = 0 fix, shared tagged-binding implementation and root-field coverage fixes. At the latest readback, Node 22/24 are still running and the current review epoch still has a Codex P2 requiring asset-pair entries to be representable in marker_set_digest, plus a Cubic P3 to align RootError::InvalidCounter documentation with the valid bootstrap sentinel. Do not merge until this exact-head remainder is resolved/dispositioned and the resulting head converges.
After #941 terminal proof, continue directly to 3C parts 2 and 3 without a chat handoff.
HISTORICAL / SUPERSEDED — pre-3B checkpoint — 2026-10-01
GATE_3 = ACTIVE
SLICE_3A = TERMINAL via #930
3A_RESULTING_MAIN = 01230de4758208f7b682ef9548720b0fd39ce801
#933/#934 = TERMINAL
#935/#936 = MERGED
CURRENT_MAIN = cd12c1041fc5e6e7197484bd81c88597f6974fa6
RESULTING_MAIN_VERIFICATION = IN PROGRESS
CODEQL / SECURITY / SIGNATURES = SUCCESS
VERCEL_PRODUCTION = READY on exact CURRENT_MAIN
NODE_22 / NODE_24 = RUNNING at latest readback
NEXT_SLICE = 3B commit markers + startup reconciliation
THEN = 3C authority-root/catalog commit + Gate 3 closure/#357 reconciliation
PRODUCTION_AUTHORITY_SWITCH_ALLOWED = NO
#936 has merged and #935 is closed. Do not keep the support lane active or reopen it without new material evidence.
Finish resulting-main proof on cd12c104..., then proceed directly to 3B. Claude is already continuing the Gate 3 lane; no chat handoff or additional governance detour is required.
Program position
Child owner of #445 for R-15 Gate 3.
TARGET_RELEASE = v1.30.0
PREDECESSOR = Gate 2 terminal
PRIMARY_LEGACY_OWNER = #357
PRODUCTION_AUTHORITY_SWITCH_ALLOWED = NO
Objective
Implement the first renderer-neutral durable protected-record adapter with real crash-durability semantics, not merely atomic rename.
Binding sequence: encrypted staging generation → file content sync → atomic replacement/promotion → parent-directory metadata durability where required → generation reconciliation → only then durable success.
Required scope
- choose one representative protected record class;
- implement Core/native durable read/write around the admitted R-15 envelope + KeyProvider;
- file and directory sync semantics by platform;
- generation and commit-marker reconciliation;
- orphan staging recovery/cleanup;
- exact failure classification, never torn authoritative state;
- deterministic fault injection around each meaningful durability boundary;
- prove plaintext staging is not left behind beyond admitted mechanisms.
#357 reconciliation
#357 is no longer a separate Tauri-only destination. Its crash-durability requirement must be satisfied by this renderer-neutral/native Core path wherever practical. Close #357 only with concrete R-15 evidence or retain a bounded legacy residual that must disappear before Gate 7.
Acceptance
- representative protected record survives the crash/fault matrix;
- sync and directory-durability semantics explicit;
- rollback/substitution cannot masquerade as latest committed state;
- no authority switch;
- exact-head/resulting-main proof complete;
- packaged evidence that cannot be proven in source CI is explicitly carried to Gate 6, never silently called PASS.
Non-goals
- full all-class migration;
- journal/rekey state machine;
- production cutover;
- unrelated filesystem refactors.
TERMINAL CLOSURE — 2026-10-02
Gate 3's defined headless durability evidence is complete for ordinary protected records. Residual ownership is explicit: Gate 4 owns serialization/admission/journal/rekey and the key-epoch crash window; Gate 5 owns asset-pair commit semantics; Gate 6 owns packaged physical power-loss proof; #948 owns protected deletion before Gate 7; the legacy TS/Tauri authority is replaced only at Gate 7.
HISTORICAL / SUPERSEDED — CURRENT EXECUTION — 2026-10-01 23:12 CEST — 3C PART 2 ACTIVE — superseded by terminal closure 2026-10-02
#941 is terminal and production-proven. #942 is now the sole active Gate 3 engineering owner. Current exact-head review/CI is not terminal. Codex returned four P2s on
48525c99...: reversible identity recovery for hashed bindings, non-ordinary-class rejection, shard-bound enforcement incatalog_set_digest, and redacted catalog Debug. CodeRabbit independently confirms the non-ordinary-class issue as Major. CodeAnt adds the same class-admission concern plus decoded binding/template/project-scope validation and a shard-bound API nitpick. CodeScene has argument-count health findings; DeepSource has one minor range-style finding. Node 22/24 and Cubic are still running; Sourcery is quota-limited. Validate the full epoch first and converge in one correction wave where practical.The Gate 3 closure must still cover the asset-pair marker/catalog boundary identified during #941 before claiming complete committed authority.
HISTORICAL / SUPERSEDED — CURRENT EXECUTION — 2026-10-01 — 3B TERMINAL / 3C PART 1 ACTIVE — superseded 2026-10-01 23:12 CEST
#940's resulting main is fully green and production-proven; Gate 3B is no longer active work.
#941 is the current Gate 3 owner. Its latest head already incorporates the bootstrap
journal_revision = 0fix, shared tagged-binding implementation and root-field coverage fixes. At the latest readback, Node 22/24 are still running and the current review epoch still has a Codex P2 requiring asset-pair entries to be representable inmarker_set_digest, plus a Cubic P3 to alignRootError::InvalidCounterdocumentation with the valid bootstrap sentinel. Do not merge until this exact-head remainder is resolved/dispositioned and the resulting head converges.After #941 terminal proof, continue directly to 3C parts 2 and 3 without a chat handoff.
HISTORICAL / SUPERSEDED — pre-3B checkpoint — 2026-10-01
#936 has merged and #935 is closed. Do not keep the support lane active or reopen it without new material evidence.
Finish resulting-main proof on
cd12c104..., then proceed directly to 3B. Claude is already continuing the Gate 3 lane; no chat handoff or additional governance detour is required.Program position
Child owner of #445 for R-15 Gate 3.
Objective
Implement the first renderer-neutral durable protected-record adapter with real crash-durability semantics, not merely atomic rename.
Binding sequence: encrypted staging generation → file content sync → atomic replacement/promotion → parent-directory metadata durability where required → generation reconciliation → only then durable success.
Required scope
#357 reconciliation
#357 is no longer a separate Tauri-only destination. Its crash-durability requirement must be satisfied by this renderer-neutral/native Core path wherever practical. Close #357 only with concrete R-15 evidence or retain a bounded legacy residual that must disappear before Gate 7.
Acceptance
Non-goals