Milestones
List view
Gate: every number in the target table either met or publicly restated with the reason. Compatibility published in GraalPy's format, including the embarrassing numbers.
No due date•0/1 issues closedGate: a real Django or FastAPI application runs, is testable with pytest, measurable with a profiler, and debuggable.
No due date•0/1 issues closedGate: numpy builds against kohebi and passes its own test suite.
No due date•0/1 issues closedGate: 10x CPython on the AOT-favourable set and 10x memory on data-dominated workloads. If this fails, restate the headline numbers.
No due date•0/1 issues closedGate: build times meet the M0.1 numbers on real programs. Output at least as fast as JIT steady state with no warmup. run and build behave identically across the test suite.
No due date•0/1 issues closedGate: at least 90% of CPython's test suite passing with every exclusion enumerated and justified. Top 100 PyPI packages install and import.
No due date•0/1 issues closedGate: 4x CPython geomean. Clean deopt and OSR stress runs. A comprehensible --deopt-stats report.
No due date•0/1 issues closedGate: pydantic-core and polars rebuild and pass their own tests. Direct typed call under 15 ns. Miri clean over the boundary crates.
No due date•0/1 issues closedGate: 2x CPython geomean on pyperformance. The CIR-to-stub path and the CIR interpreter agree on every operation.
No due date•0/1 issues closedGate: no leaks and no crashes collecting at every safepoint over the whole M1 corpus. At least 6x scaling on 8 cores. Single-thread no-GIL cost under 10%.
No due date•0/1 issues closedGate: at least 2x smaller than CPython on data-dominated workloads, and never worse on any benchmark. Speed will be mediocre here and that is expected.
No due date•0/1 issues closedGate: runs a non-trivial pure-Python program correctly, including classes, generators, exceptions, closures, and comprehensions. Passes a defined subset of CPython's test suite covering core language semantics.
No due date•0/1 issues closedFour experiments, no product code. Gate: all four answered in writing, including the two that can end the project.
No due date•3/5 issues closed